61 Waverly Street
Notice of Intent
DEP File No: 95-1016 Current Status: Hearing Closed 3/30/2026
Brief Description: 40B Development; 5-story, multi-family residential building with 216 units, associated parking lot and garages, and associated grading and utility work.
Final Approved Materials:
Approved Plan Set (with Revised Sheet C-151 Substitution), 3/12/2026
Final Special Conditions, N. D.
Order of Conditions (Not Yet Available)
Materials for March 30, 2026 Hearing:
See Revised Sheet C-151, 3/12/2026
See 61 Waverly Street, Revised Site Plans, 3/12/2026
See Draft Conditions (redlined version), N.D.
See Draft Conditions, N.D.
Materials for March 16, 2026 Hearing:
See 61 Waverly Street, Revised Site Plans, 3/6/2026
See GCG's 3rd Peer Review, dated 3/2/2026
See Applicant's Response to GCG's 3rd Review, dated 3/6/2026
Enclosures:
See Peak Discharge Rate Summary, dated 3/6/2026
See Proposed Hydrology Map, dated 3/6/2026
See Proposed Hydrology Report, dated 3/6/2026
See Existing Hydrology Map, dated 3/6/2026
See Existing Hydrology Report, dated 3/6/2026
See Recharge Volume and Drawdown, dated 3/6/2026
See TSS Removals, dated 3/6/2026
Materials for March 2, 2026 Meeting:
See Applicant's Response to Agent's 2/5 and 2/9 comments, dated 2/20/2026
See Applicant's Response to GCG's 2nd Review, dated 2/13/2026
See GCG's 2nd Peer Review, dated 2/2/2026
See Site Design Plans Revised Sheets, dated 2/13/2026
See Site Design Plans, dated 2/13/2026
Enclosures:
See Peak Discharge Rate Summary, dated 2/11/2026
See Pollutant Removal Calculations, dated 2/11/2026
See Proposed Hydrology Map, dated 2/11/2026
See Proposed Hydrology Report, dated 2/6/2026
See Riprap Sizing Calculations, dated 2/6/2026
See Buoyancy Calculations, dated 2/11/2026
See Existing Hydrology Map, dated 2/11/2026
See Existing Hydrology Report, dated 2/6/2026
Materials for February 2, 2026 Meeting:
See Applicant's Response to Agent's 1/27/26 letter, dated 1/28/26
See Agent's Response to Applicant's 1/22/26 Response, dated 1/27/26
See Applicant's Initial Response to Agent's Comments, dated 1/22/26
Produced in response to GCG's Review:
See Applicant's Response to GCG Peer Review Comments, dated 1/22/26
See Revised Site Design Plans, dated 1/22/26
See 25 Year pipe sizing, dated 1/22/26
See Bedrock contour plan, dated 1/22/26
See Contech water quality unit sizing calculations, dated 1/22/26
See Existing hydrology report, dated 1/22/26
See Existing Waverly Street 12-in RCP Capacity, dated 1/22/26
See Infiltration System WQV, dated 1/22/26
See Peak discharge rate summary, dated 1/22/26
See Proposed hydrology report, dated 1/22/26
See Recharge and drawdown, 1/22/26
See SDS-1 Buoyancy Calculations, 1/22/26
See TSS Removal, dated 1/22/26
See Existing hydrology map, dated 1/23/26
See O&M Manual, dated 1/23/26
See Proposed hydrology map, dated 1/23/26
Produced in response to Beals and Thomas Wetlands Review:
See Applicant's Response to Beals and Thomas, dated 1/22/26
See C-101 Revised Existing Conditions Plan, dated 1/22/26
See Revised Wetland Flags, dated 1/23/26
Materials for January 20, 2026 Meeting:
See Beals and Thomas Wetland Review, Dated 1/15/2026
See Applicant's Response to GCG's Peer Review, Dated 1/13/2026
See MassDEP's Comment Letter Dated 1/6/2026
See Applicant's Response to Conservation Commission's Comments Dated 12/23/2025
See GCG Peer Review Dated 12/17/2025
Reviewed at the December 1, 2025 Meeting:
See GCG Peer Review Proposal, Dated 11/25/2025
See Conservation Office Comments, Dated 11/17/2025
See DPW Culvert Review, N.D.
Original Filing;
Reviewed at the November 17, 2025 Hearing:
See Notice of Intent Package (includes drainage calculations) Dated 10/29/2025
See Plan Set Dated 10/29/2025